Q Kitchen & Bath

POPULAR QUESTIONS

Frequently asked questions from support

Straight answers about how a remodel actually works — from your first showroom visit through demolition day and final walkthrough.If you don’t see your question here, call us at: (909) 552-9090
or email: info@q-kb.com.

Costa Mesa Showroom

Walk through cabinetry, countertop slabs, tile, and hardware in person at 3135 Harbor Blvd, Ste C.

Design & Build Under One Roof

Your designer and your build team work in the same company, so nothing is lost in the handoff.

Licensed & Insured in California

CSLB License — fully insured, permitted work across Orange County.

Pre-Construction

Yes. Your first consultation at our Costa Mesa showroom is free and carries no obligation. Plan on about 45 minutes. We’ll talk through your goals for the space, walk the showroom so you can see and touch our cabinetry lines, countertop samples, tile, and hardware, and give you an honest read on whether your budget and your wish list line up. What we don’t do at this stage is produce drawings, measurements, or a design — that work begins once you’re ready to move forward.

Yes, we can give you a realistic budget range based on your room size, the scope you describe, and what similar Orange County projects have run. What we can’t give you before design is a fixed bid. A firm number requires field measurements, a finalized layout, and specific product selections — a kitchen with stock cabinetry and laminate counters and the same kitchen in full custom cabinetry with a quartzite waterfall island are two completely different projects. The range is meant to help you decide whether to keep going. The bid comes after design.

Because design is real work, not a sales tool. The retainer pays for your designer’s time: field measuring your space, drafting the floor plan and elevations, producing 3D renderings so you can see the room before it’s built, pulling and coordinating selections, and confirming that the plan is buildable within code. That’s typically 15 to 40 hours of professional labor depending on the project. Charging for it also protects you — it means we’re designing the best version of your space rather than the fastest thing we can sell.

Bring more than you think you need:

  • Photos of the existing space — every wall, plus a wide shot from the doorway
  • Rough dimensions — even a hand sketch with measurements helps enormously
  • Inspiration images — a Pinterest board, Houzz ideabook, or screenshots. Save the ones you dislike too; knowing what you’re ruling out is just as useful.
  • A floor plan or original blueprints, if you have them
  • Model numbers for any appliances you’re keeping
  • Your budget range — a real one, not a number you think we want to hear
  • A must-have vs. nice-to-have list, ideally agreed on by everyone in the household

Pay attention to how you actually use the room. For a week or two, note the specific frustrations: where you run out of counter space, which drawer you open twenty times a day, where the light is bad, what you have to walk around. Those observations shape a layout more than any inspiration photo will.
Beyond that: set a budget range you’re genuinely comfortable with, decide roughly when you want the work done and how long you can live without that kitchen or bathroom, get everyone with a say in the decision on the same page, and check whether your HOA or condo association has approval requirements or work-hour restrictions.

Our in-house design team. We don’t outsource layout to a third-party drafter or hand you off to a plan service. Your designer measures the space, develops the layout, and produces the drawings — and stays on your project through construction, so the person who made the decisions is the person answering questions when the plumber has one.

It depends on scope more than square footage. The factors that move the number most:

  • Whether plumbing and electrical stay put. Moving a sink, relocating a range, or adding circuits adds cost and permitting.
  • Structural changes. Removing a wall, adding a window, or a room addition requires engineering and inspection.
  • Cabinetry line. This is usually the single largest line item, and the spread between entry and full custom is wide.
  • Countertop material. Quartz, granite, quartzite, and porcelain slabs sit at very different price points, and so does edge detail and slab count.
  • Condition of what’s behind the walls. Older Orange County homes — especially Santa Ana and parts of Costa Mesa — often have galvanized supply lines, cast iron drains, or non-code wiring that has to be addressed once it’s exposed.

Most remodels involve at least three separate companies: a designer who draws it, a contractor who builds it, and a showroom that sells the materials. When something doesn’t line up — and something always doesn’t — you become the messenger between them. We’re a design-build firm, which means design, materials, and construction all live under one roof and one contract. One point of accountability.
Our competition falls into three groups: big-box kitchen departments, which are strong on price and weak on design and installation accountability; independent kitchen designers, who often do beautiful work but hand the build to a contractor you have to manage; and general contractors without a design arm, who can build anything but usually expect you to arrive with a finished plan and all your selections made. We’d rather be judged against those honestly than pretend there’s no alternative.

Yes, we can, but it’s a lengthy and expensive process to get an accurate match. We have to send a sample of your existing finish out for color matching, which takes six to eight weeks on top of normal cabinet production time.
It’s also worth setting expectations: existing cabinets have aged. UV exposure, cooking oils, and cleaning products all shift a finish over time, so even a technically correct match to the original spec can read slightly different next to a door that’s been in a sunny kitchen for eight years. Stains on wood grain are hardest; painted finishes match more reliably. For larger additions, refinishing or replacing the existing run sometimes costs less than a custom match and always looks better.

After The Contract Is Signed

For a full bathroom — down to studs, new plumbing fixtures, tile, vanity, and lighting — plan on roughly three to five weeks of on-site work once demolition starts. A powder room or a cosmetic refresh can be shorter. A primary suite with a custom shower enclosure, heated floors, or a relocated wet wall runs longer.
That on-site window is only part of the calendar. Ahead of it sits design and selections, permitting through your city, and lead times on cabinetry, tile, and glass. From your first showroom visit to your final walkthrough, most bathroom projects span [X] to [Y] months total. We give you a project schedule before demolition day so you know what’s happening each week.

Yes, in two layers.

Manufacturer warranties cover the products themselves — cabinetry, countertops, plumbing fixtures, tile, and appliances each carry the warranty of the company that made them. Terms vary widely; several of our cabinetry lines carry limited lifetime warranties on the original purchaser, while fixtures and appliances are usually one to ten years depending on brand and component. We register your warranties and hand over the documentation at project close.

Our workmanship warranty covers the labor and installation — our own work rather than the products.

It depends on which of our three lines you choose. Stock and semi-custom cabinetry ships fastest; full custom takes the longest because your boxes are built to your dimensions rather than pulled from inventory. Specialty finishes, custom color matches, and specialty door styles add time on top of the base lead time in every line.

Six things, roughly in this order:

  1. Final field measure. We re-verify every dimension against the approved drawings before anything is ordered.
  2. Orders placed. Cabinetry and any long-lead items go out first, since they drive the schedule.
  3. Permits submitted. We pull permits with your city — Costa Mesa, Irvine, Newport Beach, Santa Ana, and the rest of Orange County each have their own review timelines, and coastal properties may involve additional review.
  4. Schedule built. You get a week-by-week project schedule with a demolition date and a target completion date.
  5. Pre-construction walkthrough. We meet at your home to confirm protection plans, access, parking, staging, and the exact scope, room by room.
  6. Demolition day.

Miscellaneous

Because “the best cabinet” depends entirely on the project. Carrying three lines lets us match the cabinetry to your budget and your space rather than pushing every client toward the same box.

  • Entry line — clean construction at the most accessible price, in a defined set of door styles and finishes. Right for rentals, secondary bathrooms, and budget-sensitive kitchens.
  • Semi-custom — a much wider selection of doors, finishes, and interior organization, with the ability to modify standard sizes. This is where most of our kitchens land.
  • Full custom — built to your exact dimensions in any finish, with no constraint on door style, height, depth, or configuration. The right answer for unusual layouts, older homes with out-of-square walls, and projects where the cabinetry is the design.

There’s no single best — there’s a best fit for how you cook and what you want the room to look like.

Quartz (engineered stone) is the most popular choice in our showroom and the easiest to live with. It’s non-porous, never needs sealing, resists staining, and comes in consistent patterns including convincing marble looks. It’s not heat-proof — a hot pan straight off the burner can scorch it — and direct sun can fade some colors over years.

Granite is a natural stone that handles heat well and is genuinely one-of-a-kind slab to slab. It needs sealing periodically and the pattern variation means you should approve your actual slab, not a sample.

Quartzite gives you the look of marble with hardness closer to granite. It’s more expensive and more demanding to fabricate, and etching behavior varies by slab.

Marble is unmatched visually and unforgiving practically. It etches from lemon juice, wine, and vinegar, and it patinas. If that patina reads as character to you, it’s wonderful. If it reads as damage, choose something else.

Porcelain slab is extremely hard, heat-resistant, UV-stable, and thin — which makes it excellent for outdoor kitchens and waterfall edges, though the pattern is surface-printed on most products.

Come see slabs in person. Countertops are the one selection that photographs poorly and reads completely differently at full size.

The right brand depends on how seriously you cook and how the appliances have to sit in the design.

For most kitchens, the mainstream premium brands offer the best balance of performance, service availability, and price — they’re reliable, parts are easy to source, and local service techs know them. Step up into professional-grade ranges and integrated refrigeration when you cook heavily or when a fully panel-integrated, flush look matters to the design; that tier costs substantially more and often has longer lead times and fewer local service options.

Two things matter more than brand: decide on appliances before cabinetry is ordered — appliance dimensions, door swings, and ventilation requirements drive the cabinet layout, and a late change is expensive — and check lead times early, because a backordered range can hold up an otherwise finished kitchen.

Construction varies by line, so ask us about the specific line you’re considering. Broadly:

Cabinet boxes are built from plywood or furniture-grade engineered panel. Plywood is lighter, holds screws better, and tolerates moisture better — which matters under a sink and in bathrooms. Engineered panel is flatter and more dimensionally stable and is entirely appropriate in dry locations.

Doors and drawer fronts come in solid hardwood, veneered panel, or MDF. MDF is genuinely the better substrate for painted doors — it doesn’t have grain that telegraphs through paint and it won’t develop seasonal joint lines the way a five-piece solid wood painted door can. Solid wood is the right call for stained finishes where you want visible grain.

Finishes range from factory-applied conversion varnish and catalyzed finishes to hand-applied specialty finishes. Factory finishes are more durable and more consistent than anything applied on site.

Drawer construction is the fastest way to judge a cabinet line, because it’s where cost-cutting shows up first and fails soonest.

Drawer box: Look for solid wood with dovetail joinery at the corners. Dovetails mechanically interlock, so the box can’t rack apart under load. Stapled or doweled butt joints are the budget alternative and they loosen over time.

Bottom panel: A thicker bottom captured in a groove on all four sides holds heavy loads — pots, dishes, small appliances — without bowing.

Slides: Full-extension undermount slides with soft-close are the standard we build to. Full-extension means you reach the back of the drawer instead of fishing for it. Undermount means the slide hardware is hidden beneath the box, so you see wood on both sides rather than a metal rail. Soft-close catches the drawer and pulls it shut quietly.

Weight rating: Standard slides handle roughly 75–100 lbs. We spec heavy-duty slides for deep pot-and-pan drawers and for anything storing small appliances.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare